First tests

It’s time. After months of testing technical models the first integrated model is ready. In cooperation with Tildesign in Zeewolde the electronics and software are now all merged. With the oil in, the first tests are promising. Junior could hardly hold the stick. In the hydraulic part some fine-tuning is needed. In the next weeks, further